Case Study III | Manufacturing

No comments

Following a fire at a precast manufacturing plant in Lakeway, Texas, All Nation was contracted to perform the facility restoration. The 30,000 square foot/50′ tall warehouse is precast construction with bar joist/metal deck roof structure. One-third of the roof decking was fire damaged and required replacement. The structure was then soda blasted and sealed with shellac for smoke and odor control. Additionally, all windows and overhead doors were replaced, the wood shop and offices were entirely re-built, the majority of the roof blocking was replaced and the entire TPO roof system was removed and replaced.

The total scope of work performed by All Nation Restoration was nearly $825,000. The entire scope of work on this project was completed in one month. A quick response was critical to this client as down time prevented them from meeting customer demand.