Case Study V | Senior Living Community

No comments

After a fire in a Austin Senior Living Community, All Nation Restoration was able to quickly restore 17 resident units, as well as the affected common areas. Half of the affected area was stripped down to stud walls, upgraded to current code (including installing a sprinkler system in the entire affected area), and re-built from there. The other half of the affected area was stripped of the finishes (wall coverings, floor covering, paint) and restored.

Our portion of the work was approximately $750,000 and was complete in two months. This quick project turnaround was very important as the residents of the 17 units were displaced while work was ongoing.

adminCase Study V | Senior Living Community