Following a fire at a precast manufacturing plant in Lakeway, Texas, the owners contracted All Nation to perform the facility restoration.
The 30,000 square foot/50′ tall warehouse is precast construction with a bar joist/metal deck roof structure. One-third of the roof decking had fire damage and required replacement.
The building was then soda blasted and sealed with shellac to treat the smoke damage and for odor control.
Additionally, they replaced all of the windows and overhead doors. It was also necessary to rebuild the wood shop and offices. Then, they replaced most of the roof blocking and TPO roof system.
The total scope of work performed was nearly $825,000. It only took one month to complete the entire amount of work.
Here’s a Senior Living Community that went through a similar situation.
A quick response was critical to this client as downtime prevented them from meeting customer demand.